Emergency and exit lighting
Installation, six-monthly testing to AS 2293.2, and a log your auditor will accept.
The CBD is about seven kilometres from our Hawthorn East workshop. Access, inductions and loading dock bookings usually determine timing more than travel does.
City work is different in kind rather than in degree. The electrical problems are ordinary. Getting to them is not. Access, building rules and the boundary between a tenancy and the base building decide how a CBD job runs.
Most buildings require a site induction, a loading dock booking, an approved window for noisy or hot work, and sometimes a permit. None of it is hard, and a contractor who turns up without it does not get through the lobby. We deal with building management directly rather than handing the paperwork back to you.
Inside your tenancy is yours. Risers, the main switchboard, the meter room, corridors and the base building distribution are not. That boundary decides who authorises the work and who pays for it, and establishing it before quoting is what keeps a job from stalling between a tenant and a building manager.
This is the compliance work the city generates most of. Emergency and exit lighting has to be installed to AS 2293 and tested six-monthly, with a log. It sits unused for years, which is exactly why it fails quietly, and it is the system most often found to be non-compliant when somebody finally checks. Whoever holds the obligation, the tenant or the building, is worth settling in writing.
A working tenancy cannot lose power during trading, so fitout and alteration work runs at night or over a weekend. That is normal here and it needs to be in the programme from the start rather than discovered when the outage is planned.
Residential towers bring the same common property question as commercial ones, with a committee rather than a building manager making the decision. Overnight, the real limit on an emergency call is not our travel time, it is whether someone can let us into the building.
Office equipment sits in a benign environment and belongs at the long end of the intervals in the standard, not on the same cycle as a kitchen. What matters more than the tags is the register, because that is what demonstrates compliance to an auditor or an insurer.
Seven kilometres from Hawthorn East, so travel is rarely the issue. Induction and access arrangements usually decide when we can start, and we sort those out rather than leaving them with you. The phone is answered 24 hours, and for an overnight emergency in a secured building, someone needs to be able to let us in.
We also cover Richmond, South Yarra.
Installation, six-monthly testing to AS 2293.2, and a log your auditor will accept.
New tenancies, relocations and make-good, coordinated with your builder's programme.
Portable appliance and safety switch testing on the interval your environment requires.
Shop, office and warehouse lighting, including LED changeovers priced around access rather than per fitting.
Board upgrades, added distribution and capacity checks before a fitout commits you.
We complete whatever the building requires, including inductions, loading dock bookings and permits, and we arrange them with building management directly. It does mean a city job needs more notice than a house, which is worth building into your programme.
It depends on the lease and where the fittings are. Within your tenancy it is usually yours, and in common areas it is usually the building's. It is worth settling in writing, because the obligation to test six-monthly and keep a log does not disappear because two parties each assumed the other held it.
Largely, yes. The work that needs an outage runs at night or over a weekend, and the rest happens around you. The important part is having the outage window in the programme from the start rather than discovering it near the end.
We can get there quickly, but we cannot get into a secured building without someone to let us in. Concierge or building management access is the limiting factor, not our travel. Ring anyway and we will tell you what access the building actually allows at that hour.
Less often than a workshop or a kitchen, because the standard sets intervals by environment and an office is benign. The register matters more than the tags: it is what actually demonstrates compliance, and it is the part most sites do not have.
Fastest way to get an answer is the phone. It is answered 24 hours a day, seven days.
03 9889 3341Not urgent? Send the details and we will come back to you within one business day.