House rewiring
Period homes with cloth or rubber-insulated wiring brought up to AS/NZS 3000, in stages if needed.
Armadale is about five kilometres from our Hawthorn East workshop, roughly fifteen minutes outside peak hour.
Armadale sits between the scale of Toorak and the density of Prahran, and its housing reflects that: substantial Victorian and Edwardian villas on decent blocks, terraces on the Prahran side, and a design and retail strip along High Street that turns over steadily.
The common history here is a house rewired in part rather than in full, usually when a kitchen or bathroom was renovated. Newer cable serves those rooms and the original serves everything else. The danger is not the old cable itself, it is the assumption that the whole house was done. If nobody can tell you which circuits were replaced and when, that is worth establishing in writing.
The High Street strip is full of showrooms, galleries and studios where lighting is the product rather than the utility. Track, display and accent lighting on dimmable circuits is routine work here, and the constraint is usually the tenancy’s existing circuit provision rather than the fittings themselves.
Armadale blocks frequently back onto laneways with garages, and a good number of those have become studios, gyms or offices. The submain feeding them was almost always run for a light and a door motor. Converting the use without revisiting the supply is what produces the flickering and the tripping that follows.
A period villa that acquires ducted climate control, an induction cooktop, a second bathroom and a wine room has roughly doubled what it draws, usually in stages, each one landing on a board that was already near its limit. The switchboard tends to be the last thing considered and the first thing that should be.
Much of the residential stock here sits under heritage controls, which affects visible cable runs, meter box positions and external equipment placement more than it affects the work itself.
Around fifteen minutes from Hawthorn East outside peak. Morning faults are usually attended the same day. For genuine emergencies we aim to be on site within two hours, and the phone is answered 24 hours a day.
Period homes with cloth or rubber-insulated wiring brought up to AS/NZS 3000, in stages if needed.
Downlights, pendants and outdoor lighting, replaced or run from scratch.
Ceramic fuses replaced with circuit breakers and safety switches, with capacity left for what you add next.
New outlets, USB points and outdoor weatherproof power, added on a circuit that can carry them.
Dead circuits, tripping safety switches and power points that run warm, traced to the cause.
By inspection. Cable type, the board, and what is visible in the roof and subfloor tell the story fairly quickly. We write down what we find and which circuits are still original, so you have a record rather than an assumption.
Almost certainly. Those submains were run for a light and a door motor, and a studio with heating, a computer and a kettle is a different load entirely. We size the replacement for what you will actually run rather than matching what is there.
Yes, and the thing to check first is what the tenancy's existing circuits can carry, because that usually decides the layout more than the fittings do. We look at the space before specifying anything.
A switchboard upgrade, and possibly the consumer mains depending on what else has been added over the years. We check the mains size at the same time, because there is no point fitting a bigger board behind an undersized supply.
It affects what is visible from the street, such as surface conduit and meter box positions, rather than the work itself. We plan routes through roof and subfloor space and raise anything likely to need approval at the quote stage.
Fastest way to get an answer is the phone. It is answered 24 hours a day, seven days.
03 9889 3341Not urgent? Send the details and we will come back to you within one business day.